Instructions on how to complete TA002 “Request for Forecast Turning Movements” form

  1. The first section of the TA002 identifies the contact information for the parties submitting the request (Project Manager, Transport Planner, Project Sponsor).
  2. Transport Analytics, Forecasting Team, will provide forecast OD Matrices for subarea networks modelled in Aimsun Next only if preparing forecast OD Matrices is not specified in the scope of works for Consultants in their contracts with DPTI
  3. The requestor shall fill out the “Study/Project description” and provide as much detail about the study/project and location as possible. Documentations to identify specific location and size of any proposed developments/modification or upgrade to road infrastructure are required to be uploaded. The years for which forecast data is requested, i.e. 2021, 2026, 2031, and/or 2036, are also to be specified.
  4. If the request is for forecast turning movements for isolated intersection(s), please use Form TA001.
  5. Make sure that the following documents are ready for upload:
    1. Project Brief or Project Definition Report (required)
    2. Calibrated and validated base case subarea model in Aimsun Next (MATSAM subarea microsimulation model) along with the calibration and validation report
    3. Plans/drawings for proposed modifications/upgrades to the road infrastructure/network
  6. Provide an explanation of any other specific details that would assist with the completion of the forecast

To note:

  • Providing forecast OD matrices is subject to the receipt of the completed TA002 form and subject to item 2 above;
  • Forecast OD Matrices are prepared based on DPTI’s strategic transport models which are based on a range of assumptions in accordance with the State’s strategic policies and plans, and
  • These forecasts may need to be revised should these key assumptions change.
  • These forecasts are not to be used for any purpose other than that specified on the TA002 form.

Turnaround times

Generally, please allow a minimum of four weeks to complete the request for forecast OD Matrices for a subarea.

Turnaround time for complex projects can be substantially longer. You will be contacted with an estimated turnaround time within a few days of receipt of the completed form.

* required fields

Submitted by
Organisation *
Project Manager
Project Sponsor
Transport Planner
Project/Planning Study High Level Information
Requested forecasts are to be used for input into *
(If not applicable, please enter N/A)
(if not applicable, please enter N/A)
Required Information for the Preparation of the Forecasts
1. Is this request for forecast OD matrices for use in network modelling? *
3. Does a project brief, project definition report or similar exist for this planning exercise/project? *
(in MS Word or PDF format)
4. Does this request include amending any of the assumptions used in DPTI's strategic transport model for the requested location(s) and/or the network in vicinity of the location(s)? *
5. Are there other projects in the area that could affect this forecast? *
6. Do you have the calibrated and validated base year subarea model (in Aimsun Next) along with the calibration and validation report? *
DPTI may contact the requestor with regards to the endorsed subarea model
7. Do you have plans/drawings showing the proposed upgrades/modifications to the road network infrastructure? *
(JPG, PDF or DWG)
8. Please select how and where the forecast data is intended to be used *
9. Specify the year(s) for which forecast OD matrices are requested *