Section menu
Division D Design
These parts specify design requirements for Design and Construct Contracts. Refer to Division P for professional services contracts (eg planning / design).
Document Name | Comments / Instruction |
CSTR Division D Design | Effective 1 July 2018 |
Part D01 Design and Construct Preliminaries | Effective 1 July 2018 |
Part D10 Design - General | Effective 1 July 2018 |
Part D12 Independent Design Verification | Effective 1 July 2018 |
Part D13 Road safety Audit | Effective 1 July 2018 |
Part D16 Safety in Design | Effective 1 July 2018 |
Part D19 Design Environmental | Effective 1 July 2018 |
Part D20 Design Road Infrastructure | Effective 1 July 2018 |
Part D27 Design Utility Services | Effective 1 July 2018 |
Pat D35 Design Structural | Effective 1 July 2018 |
Part D37 Urban & Landscape Design | Effective 1 July 2018 |
Part D81 Railway Tracks Design | Effective 1 July 2018 |
Part D82 Design Railway Signalling and Communications | Effective 1 July 2018 |
Part D83 Railway Overhead Wiring Design | Effective 1 July 2018 |